Mom thought that perhaps this was the reason for the LULL in activity up there for a while.

The girls thought it was a great place to play (definitely less muddy)!

These are the interior, main floor walls. This view shows (from left to right) kitchen with pantry behind it, master bath and closet, master bedroom.

On the other side of the house is (from left to right) study and mud room/laundry room/ T's workspace. There will also be a small washroom with shower in here, but that is not framed in yet. The central space will be kitchen, dining room and great room...all open, and the great room will have something like 17 foot ceilings.






Today the men were crawling all over the roof. They had already put up the trusses for the hip roof in the back of the house. This will create 8 foot ceilings over the framed out rooms on the sides of the house.


They used the LULL to move these trusses for the high ceilings over the great room. That's our builder in the black hat...a really nice guy! Unfortunately, it got stuck about 20 yards from the house.











